Pakistan Classifieds Advertisements

Insulation and heat adjustment in KPK, equipment , scraping, , Resistant8 solid content

  • Location:Peshawar, Pakistan
  • Street Address:
  • Date Posted: Apr 18
  • Phone:>
  • Price:Free
Type: DomTyp: DachyMamy industry best waterproofing and protective coatings for all types of waterproofing such difficult situations, roof, walls retaining, basement walls, floors, pools etc ProofingWater Water dowd Pokrywanie the roof is an important task to repair the roof and the roof preservation.Many the assurance and y . the roof treatment including removal of existing damaged / cracked roof treatment and its disposal, including thoroughly cleaning the surface applied with a suitable detergent to remove any surface contamination such as oil, grease, etc. Apply verdigns minimum 05 five discs for concrete electrometric waterproofing roof / wall or similar surface 5-6 m / L using a brush / roller. Thinning the mixture is not required and the color should be the user's choice in the costs of materials, labors, tools. Moving equipment ", scraping, cleaning removing dirt from the surface as smooth transport of goods and the finish, etc. Specifications and as the engineer and the framework of the following: -. 1 Color - white2. Denisty - 1.2 gm / c c3. maximum tensile strength - 150pci ASTM D 412 4 Elongation at break - 690 ASTM D 638 after the fifth thickness 1.5mm6. pedestrians - may be allowed after coating7. Accelerated UV Resistant8. solid content m / -68.4 m ASTM 2369 We use ON THIS PALACE waterproofing: 1 Roof must be clean and dry, wash the roof of water. 2 sleepers chemical compound doped cement.3. joint creakers will be filled by chemical compound.4 . coat applied after Polestar sheet5 fibers. Fainal coat for all roof of chemical admixture for Proofing ACR cement. HEAT: 1 Roof must be clean and dry, wash the roof with water.2. sleepers with compound.3 chemical. coat applied after sheet4 polister fibers. The final coat all of the water tank chemical admixture. roof: 1 First time cleaning the water tank and dry.2. Primers chemical compound doped cement.3. Common creekers will be filled by compound.5 chemical. The final coat all of the water tank of chemical admixture by ACR cement. Bathrooms:. 1 All points and dry cleaning blower machine.2. use all the points of a chemical spill in cement3 bathroom. All clay filling for white cement with chemical.Regards 4 please do not use the water at points. Duration 24Hrs. Your prompt reply AAAAAAAAAAAAAAAAAAAAA AAAAAAAAAAAAAAAAAAAAA AAAAA Umerhayat Yours

Pictures and Videos

Insulation and heat adjustment in KPK, equipment , scraping,    , Resistant8 solid content

Insulation and heat adjustment in KPK, equipment , scraping, , Resistant8 solid content

Contact This Advertiser!